[ 01/04 ]
Road improvement
Widening and realignment: subgrade replacement, kerbs and gutters, and the paving on top.

Taisetsu Line is a civil contractor in Asahikawa and the Kamikawa area: road improvement, bridge repair and snow clearing.
Under the surface lie the subgrade and the base course. Compact them thick enough and the road wears differently ten years later.
The machines and tickets behind the work
Judge us as much by how we built it as by what we built.
Before we break ground we walk the neighbourhood and the school route and set the order in which traffic moves. The programme is rewritten every week.
We check the moisture of the subgrade before we roll it. On a wet day we do not compact.
Instead of batter boards we dig with satellite-guided machines and keep the finished shape in three dimensions.
The morning starts with a hazard briefing for everyone; the day ends by looking under every machine.
[ 01/04 ]
Widening and realignment: subgrade replacement, kerbs and gutters, and the paving on top.
[ 02/04 ]
Deck replacement, bearing renewal and section repair, worked at night under single-lane alternating traffic.
[ 03/04 ]
Town routes and mountain roads, cleared before the morning commute. De-icer spreading included.
[ 04/04 ]
Site formation for housing and factories, and slope protection on cuttings. Spoil is reused on site.
RoadsWe widened a city road that had run out of width and replaced the gutters. It is a school route, so one lane stayed open every morning and evening.
Ask about work like this
BridgesThe worn deck was replaced overnight and traffic ran again by morning. The temporary falsework was built around the river level.
Ask about work like this
SnowFrom December to March we open the route between night and morning. How much de-icer goes down depends on the air and surface temperature.
Ask about work like this
EarthworksWe levelled sloping ground and gave the rainwater somewhere to go. The cut material went back into the fill on the same site.
Ask about work like this
RoadsWe widened a junction where right-turning traffic backed up and added a footway. The work was split into three sections so no shop entrance was ever blocked.
Ask about work like thisWe price the job after seeing it. Within Asahikawa and the Kamikawa area we can give you a rough figure on the spot. There is no charge for the estimate.
Yes — replacing a gutter, surfacing a car park, anything that finishes in a day. Call us and tell us what you have.
We work by neighbourhood association or by business. A private house is taken on only when it sits on a route we already clear.
Before we start we call on the neighbours and tell them the working hours. When we are driving piles we let them know the day before.
Paving and compaction lose quality as the temperature drops. From November we only make a temporary reinstatement and finish the job after the thaw.
The careers section lists the trades we are hiring and how the work is organised. You can apply with no experience.