A Tarnwell suite opens on the date written in the lease. Permitted, built and inspected to it.

Tarnwell

EST. 2009DENVER

EST. 2009

Tenant

Interiors

DENVER

How we run a job


Method

Every job starts from the rent-start date in the tenant’s lease and works backward. Week one is a walk of the shell with the architect, the engineer and our superintendent, then a written schedule and a line-item budget. The permit set goes to the city by week three, and long-lead items such as storefront glass and rooftop units are ordered the same week.

On site, one superintendent stays with the job from demolition to the final walk. Owners get a photo log every Friday and a punch list that is closed before the keys change hands.

Recent Fit-Outs


From permit set to occupancy

Our work is tenant improvement: offices, shops and dining rooms inside buildings that already stand. We keep no more than seven jobs open at a time, so the superintendent who walks the shell is the one who signs off the punch list.

Since 2009 we have handed over 212 suites across the Denver metro, from 1,800 sq ft coffee counters to 40,000 sq ft office floors. About a third of our work is repeat work for the same building owners and property managers.

See all projects

Wazee St. Café2025
Brighton Blvd. Lobby2025
Blake St. Canteen2024
South Pearl St. Shop2023

Who we build for


Tarnwell works for whoever signs the tenant improvement contract: building owners, their brokers and property managers, and the brands moving in. Architects bring us drawings to price.

  • Building ownersSpec suites and lobbies
  • Brokers & property managersTurnover between tenants
  • Retail brandsStore openings
  • Restaurant groupsKitchens and dining rooms
  • ArchitectsBuild-to-drawings pricing

1/5A 9,600 sq ft spec suite, ready to lease

If a plan-review comment, a late rooftop unit or a failed inspection moves the opening date, the owner hears it from us the same day, in writing, with the new date, the reason and what it will cost.

Our schedule rule, on every job since 2009

On site


What an owner sees on a Tarnwell job, week by week. Demolition and layout take the first two weeks; framing, rough-in and inspections run through week eight; ceilings, finishes and millwork close out the rest. Our superintendent walks the site with the owner every Friday, sends a photo log the same afternoon, and keeps the inspection card on the wall where anyone can read it. When the city signs the certificate of occupancy, the punch list is already closed.

Drywall & paintWeeks 6–10

HandoverWeek 14

Handover log